ProductCamp 2026 · Ottawa

How a Product Person Ships Real Products

The building story behind Joe Speaking with  

Joe Hu
Joe Speaking
Joe Speaking
joespeaking.com
QR
Joe (Beiqiao) Hu
M.Eng TIM, Carleton University Founder, Just Joe Technologies
Product Person & Vibe Engineer
Quick Survey
Let's see where we are.
Quick Survey
Let's see where we are.
01How many people here have heard of Anthropic or Claude?
02How many have used Claude?
03How many use Claude Code?
04How many use Codex?
05How many pay for Claude Max or ChatGPT Pro?
We are still very early.
AI adoption visualization — each dot is ~3.2 million people
Each dot ≈ 3.2 million people · Feb 2026
Source: @damianplayer
Press Space or Click to reveal
PRODUCTCAMP JOURNEY
ProductCamp Ottawa 2025 event photo
ProductCamp 2025
Ottawa
Deep Research talk title slide
Deep Research: Beyond Surface-Level Answers
This year → A real product story
ONE YEAR LATER
What Changed in One Year
As a former non-technical builder, I built my first commercial product with:
Claude Code Codex Claude Code & Codex
● Only one person
Not a prototype. A real product with real users and real revenue.
And once you enter that world, you see the whole startup process differently.
Joe Speaking app icon
Prototype
Exciting
Experimental
Could not continue
Real Product
Users & Support
Payments & Revenue
Reliability & Trust
Analytics & Distribution
Bug Reports & Onboarding

WHAT I BUILT

Joe Speaking

joespeaking.com

An English speaking test simulator with natural conversation, real-world feedback, and a full practice lifecycle — 100× less cost, fully personalized, built by a learner for learners.

I built it for myself first — now it’s yours. My first commercial product. Real users. Real revenue.

0:00 / 0:00
Natural A.I. Conversation Recording Practice IELTS CELPIP Pay-as-you-Go
Theory-Driven Design Flash Cards Personal Collection Daily/Weekly Review

WHY I BUILT IT

01

English Was My #1 Barrier

English was the top challenge that stopped me from going abroad. I built it for myself first — then share it with others.

My English Speaking Story →
02

Research Meets Entrepreneurship

TIM master’s project needed a real product. Thanks to Hai and AGI Ventures Canada for believing in this from day one.

03

Leveraging What I Already Built

100K+conversations on ChatGPT
4.4rating
500+reviews

The best way to learn is to just build things. I wanted to turn it into a real product.

IELTS Speaking Simulator GPT
HOW I BUILT IT
ResearchSep – Nov ’25
BuildNov ’25 – Feb ’26
LaunchFeb ’26
Evidence-Based Foundation
17
Studies
6
Theories
10
Mechanisms

Summarized from 2,877 academic records screened.

“Easy to prototype,
challenging to ship.”

🚨 Critical Bottleneck

Gemini Live API

Planned 1 week Took 5 WEEKS
Project Timeline Data
REAL TRACTION

Alpha · February 5 – April 16, 2026 · $0 Ad Spend · Marketing Not Yet Started

40%

Core Flow → Paid Conversion

41

Paid Users

$350+

Net Revenue

$0

Ad Spend

LEARNING IN ACTION
300+
Simulator sessions
72.9% completion
900+
Recording sessions
4.8 avg/user
3,200+
Flashcard reviews
74.3% retention rate
1,200+
Total AI feature uses
8,000+ credits consumed

Organic Funnel

Unique Visitors 566
Logins (90%) 511
Active Users 152
Paid (27%) 41

“I don’t want my product to be popular yet — I want it to be great first.”

USAGE INTENSITY

My AI Usage

Subscriptions, daily drivers, and live token usage

Live embed • 30-day range • aiusage.hubeiqiao.com
Vibe Engineering
THE SHIFT

You Can Now Skip the Middle

The old path is not gone, but it is no longer the only path.
Build quickly. Validate through action.
In uncertain territory, speed of learning through action often beats slow, data-heavy deliberation. Now I believe that even more strongly.
Connecting to Beyond the Numbers — ProductCamp 2025
The Old Path
Come up with an idea
Write a PRD
Wait for resources
Hand it off
Review
Launch
Hope it works
The New Path
Identify the problem
Build a quick version
Test it yourself
Validate directly
Iterate fast
Ship it
Know it works
🔗
This connects to what I shared last year in Beyond the Numbers: in uncertain territory, speed of learning through action beats slow, data-heavy deliberation.
WHY THIS MATTERS

The Execution Boundary Moved

This does not mean PMs need to become full-time engineers. It means the strongest PMs can now do much more of the loop themselves.
When execution gets cheaper, the bottleneck becomes judgment.
The Real Bottleneck Now
What to build Why it matters How it should work How to tell if it is good
The New PM Loop
1 Identify the problem
2 Define the workflow
3 Turn thinking into a plan
4 Build a working version
5 Verify quality
6 Iterate quickly
7 Ship to users
"The PM role now is to track both things at once: how AI is changing the way you work, and how it's changing what's possible in your product."
PRODUCT JUDGMENT

My Original Thought Was Different

What I wanted to build
An AI tutor based on my practice transcripts, something that could tell me how to improve next.
Last October I tried to prototype analysis around that idea. But it was not ready yet.
I remember listening to Andrej Karpathy talk about how he learned Korean and how AI compared with human tutors. One takeaway: AI tutoring was not fully there yet in the way I wanted.
That helped me realize something important.
What I built instead
The fundamentals first.
  • Not the most ambitious future version
  • Not the smartest dream version
  • The inputs part. The practice loop.
Once those are strong,
more becomes possible later.
MINDSET SHIFT 2

Build from Your Own Interests

I did not build Joe Speaking only for revenue. I built it because it matched my own pain, my own curiosity, and what I wanted to learn about AI.
Joe Speaking
Even without a traditional job, I created my own job to try these workflows and feel the power of AI through something real.
The product became my classroom.
"My friends always ask me: why are you always so passionate about the things you are doing?"
Find the things you have passion for, and do them.
Not just a short project
Not just a weekend toy
Not just chasing revenue
Something you believe in enough to keep improving
Believe what you are doing.
It is a long-term game.
MINDSET SHIFT 3

You Still Need Something That Stands Out

AI makes building easier. But that means everyone can build. Differentiation still matters. You need one feature or one angle that really stands out.
Joe Speaking's Killer Feature
Real-time conversation.
Basic recording plus end-to-end infrastructure would not be enough. The thing that set it apart was also the hardest thing to build.
The Reality
My original estimate was much too optimistic. Integrating the real-time experience was far harder than the clean product story made it look from the outside.
That is where my technical knowledge was not enough. I spent more time going back and forth. But that is exactly why it matters.
You still need one thing that is hard to copy quickly.
Taste and judgment still matter.
That is where differentiation happens.
TOOLS & TECHNIQUES

What Tools I Actually Use

Not just coding tools. General agents for computer work.
Claude Code
Claude Code
Primary agent
Planning, coding, debugging, testing, deploying
Codex
Codex
Review & parallel work
Cross-model review, parallel audit, async tasks
As long as a task can be completed by your computer, AI is going to take it.
Build apps
Write docs
Build websites
Debug logic
Generate images by coding
Run tests
Create videos by coding
Research
Generate slide decks (like this one)
Data analyze
A very different category from a normal chatbot.
100–1,000×
More token usage than last year
HOW I WORK

My Workflow at a Glance

I shared my full workflow 3 months ago at cc.hubeiqiao.com. When I revisited it for this talk, some techniques are still helpful, some are already outdated. Here are the high-level ideas that still hold.

Mobile changes everything. Have an idea? Tell AI. Validate the result. Ship by day.
The Priority Shift
In the past, not every requirement could ship quickly. Now with AI, you can let it try. If it works, you ship it that day.
Claude Code
Main coding agent. Local terminal, deep context, multi-file edits.
Codex
Cloud tasks. Parallel branches. Background execution.
📱
Claude Mobile
Run cloud tasks or connect to local version on the go. Ideas become actions anywhere.
⚡
Ship by Day
AI tries it. If it works, ship it. Requirements that used to wait weeks now land in hours.
MY WORKFLOW

Draft the Plan First

Write what you want first. Then talk with AI to revise the plan. Multiple rounds. This is one of the best ways to demystify the black box.
Rough Draft → AI Review → Refine → Build
📋 Better breakdown
🎯 Clearer tasks
🔍 Visible assumptions
❓ Ask questions back
Claude Code Codex
Use multiple models. Let Claude Code draft the plan, let Codex review it.
Plan document phases
Plan document with phases
Codex reviewing the plan
Codex reviewing the plan
This talk itself followed the same path:
rough draft → plan doc → HTML slides
QUALITY

Validation Matters More Than Ever

Teach AI to verify its own work. All actions should be evidence-based. There should be enough logs.
UI
Inspect screenshots and the real interface
Logic
Run tests
Bugs
Reproduce first, then fix
Workflows
Build end-to-end tests
Plan verification steps
Verification plan
GitHub PR checks passed
PR checks passed
The Real AI Quality Loop
1Reproduce the problem
2Write the issue clearly
3Add logs
4Verify the plan
5Implement
6Test
7Compare
8Explain
This is why real product work burns so many tokens. AI can run for hours, even days. Good usage is not just "write the code."
Lesson from Joe Speaking
I should have built the E2E harness earlier. It needs to accurately answer your questions before you trust the results.
Go through the whole process manually first. Find the cases. Then ask AI to automate them.
WORKFLOW DISCIPLINE

Work Smarter with AI

Context Management
Bigger Windows Do Not Solve Everything
Even with bigger context windows, context management still matters. Do not keep everything in one endless conversation.
Otherwise performance degrades and assumptions drift.
✂
Break work into smaller units
🔄
Open new conversations when needed
🧹
Refresh context when the task changes
Reusable Skills
Turn Repeated Workflows into Systems
When you notice a repetitive workflow, systematize it. This is one of the easiest ways to compound your own capability.
📝
Saved Prompts
Reuse what works
⚙
Scripts
Automate the steps
✅
Checklists
Catch what you miss
⚡
Slash Commands
One-tap workflows
📄
Doc Templates
Consistent structure
🔁
Reusable Patterns
Compound over time
Every repeated workflow you systematize makes you permanently faster.
DEBUGGING IS THE REAL SKILL

Hard Issues: What I Actually Do

1Let AI write a document first. List the issue clearly.
2Add logs to find the evidence.
3Let multiple models audit or analyze it.
4Search online if needed.
5Retry with a cleaner context window.
6After each failure, reflect and record.
7Ask for help: community, X, Reddit.
8Sometimes just wait for a better model.
Not coding faster. Debugging better.
When you build real products, debugging becomes the most important skill.
Incident doc
Incident doc
Bug investigation
Bug investigation
Investigation report
Investigation report
THE PM ADVANTAGE

PMs Have an Underrated Advantage

These are exactly the things that become valuable when AI is your execution layer.
I did not "learn to code." But I became far more effective at shipping.
Even when you do not know something, you can ask AI dumb questions. The more you interact, the more you know. Learning is no longer separated from building.
What PMs Already Know
🎯 Clarify ambiguous goals
🧩 Break things down
🔄 Think in workflows
🐛 Communicate bugs clearly
✅ Define expected behavior
👁 Judge user experience
A different kind of capability shift.
BEYOND AI OUTPUT

What Building a Real Product Still Requires

It is easy to romanticize one-person AI building too much. A real product still requires a lot of things beyond AI output.
STILL REQUIRED
🧠 Product judgment
🔍 Manual QA
📊 Prioritization
⚠ Knowing when not to trust the model
❤ User empathy
⏳ Patience
🤝 Community
📣 Distribution
💪 Persistence
AI gives leverage. It does not remove responsibility.
The strongest people in this era will not just be people who know prompts.
They Will Combine
🔥High agency
⚖Good judgment
💡Clear thinking
✨Product taste
🚀Willingness to keep shipping
Not just people who know prompts. People who can ship.
FOR STARTUPS & FOR YOU

What This Means for Startups

One person can now go much deeper into the stack. Not everything forever, but enough to see the company through direct experience.
🏗 Understand constraints more directly
👥 Understand users more directly
⚖ Understand trade-offs more directly
That is one of the most valuable parts of this journey for me.
If You Remember One Thing
Claude Code Codex
Please try Claude Code or Codex to build something.
Build something small. Build something useful. Build something for yourself.
The learning curve is not only about tools. It is about changing your identity from someone who waits for execution to someone who can drive it.
CLOSING

It Is Time to Build.

Not because AI is perfect. It is not.
Not because quality no longer matters. It matters even more.
Not because the hard parts disappeared. They did not.
But because the distance between product thinking and product execution has become dramatically smaller.
From a former PM without a strong technical background, to someone building a real product with real users and real revenue. Joe Speaking is my first proof. And we will see many more stories like this very soon.
Joe Speaking QR
Try Joe Speaking
LinkedIn QR
LinkedIn
X QR
X / Twitter
Thank You